Tower lighting

Date: 
2013-09

Client: Serco
Contract Name:Tower lighting
Site Location: Curtin Immigration detention Centre
Year: 2013
Scope of Work:

Installation of 4 x 16m lighting towers and 10 street lights

  • Lighting design and layout
  • Ground survey
  • Excavation, conduit and cable installation
  • Concrete and Rag bolt assemblies installation for standing/fixing of the Lighting Towers.
  • Alterations and additions to the Existing Main Switch Boards to cater for the upgrade.
  • Termination of lighting tower